Home Forums Get Help for Klok Collating time from sub projects

  • This topic is empty.
Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • #963
    Anonymous
    Inactive

    I have the following set up:

    Project: 0 hours
    Sub Project 1: 1 hour
    Sub Project 2: 2 hours

    When I produce a time sheet it lists the time spent on each project, which is fine, however I’d like it to add up the time spent on the sub projects in the main project window so it looked like

    Project: 3 hours
    Sub Project 1: 1 hour
    Sub Project 2: 2 hours

    Is this possible? The reason I’d like it is so I can track the time taken on single tasks to collect metrics, but to bill the customer I only care about the main total.

    #1758
    Anonymous
    Inactive

    I have a similar need, though I may also enter time on the top-level project that needs to be added into the time from the sub-projects for the grand total.

    #1759
    Anonymous
    Inactive

    I would also like this functionality. Is it possible in the existing Klok or should this be moved to feature requests?

    Simon

    #1760
    Anonymous
    Inactive

    Got my answer at the page above. I renamed the xml file liked suggested and was able to get it to load again. I made sure to backup before relying on it not freezing again! :)

Viewing 4 posts - 1 through 4 (of 4 total)
  • You must be logged in to reply to this topic.