Home Forums Get Help for Klok Timesheet for Estimates

  • This topic is empty.
Viewing 1 post (of 1 total)
  • Author
    Posts
  • #957
    Anonymous
    Inactive

    I was wondering if there was a way to get a report or timesheet for my Estimated time on each project, not just the actual time? I ask because the time I bill for is a rounded version of the actual time. I am currently keeping track of the time I actually bill for each task as the Estimated time but there is no way for me to see it all at once.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.