Hi,
I would like to know how do i copy a weeks timetable throughout the month.
I have a standard timetable as i am an ungrad. Is it possible to copy my weeks routine into other weeks? or do i have to manually do it each week?
Also, just would like to know why the projects stack against each other(side by side) as i drag and drop them into a day, even though they are hours apart.
(i uploaded a picture of my description.)
Any help would be much appreciated. Thanks.